Find a service or website

Type at least 2 characters to search.

Power Outage Latest: 154,000 Still Dark in Indiana After Three Storms; Colombia’s Quake-Hit Networks 80% Restored

Power Outage Latest: 154,000 Still Dark in Indiana After Three Storms; Colombia’s Quake-Hit Networks 80% Restored

August 15, 2026

Four days after the first of three consecutive storms crossed northern Indiana, 154,000 homes and businesses were still without electricity on Saturday morning — the tail of what the region’s utility calls one of the largest outage events in its history. Several thousand kilometres south, Colombian carriers were moving the other way, restoring mobile and fibre service after a 7.4-magnitude earthquake, held back by the same constraint: no mains power.

Northern Indiana: 154,000 still dark after three storms in three days

Northern Indiana Public Service Company (NIPSCO) reported 154,000 customers without power as of 7 a.m. Central time on Saturday, with 163,000 restored since the event began. The scale comes from the storms arriving back to back rather than from any one of them: outages peaked near 301,000 after Tuesday’s storm, about 313,000 after Wednesday’s and roughly 317,000 after Thursday’s. At the worst point, the utility says, more than 60 per cent of its electric customers were off supply.

Reporting from Chicago, WBBM Newsradio put the figure at 185,000 still out at 11 a.m. on Friday, indicating the pace of reconnection over the following twenty hours. The station also recorded frustration from Hammond Mayor Thomas McDermott, whose city cleared debris hoping to speed crews to the worst-hit streets. “We were hopeful that if we busted our butts in Hammond it would make a difference and it has not made a difference and I’m sad about that,” he said, while cautioning against blaming the utility: “In their defense, we were hit with an inland hurricane, tornados, widespread damage across their entire service area.”

NIPSCO attributes the slow going to extensive tree damage, blocked roadways, flooding, entangled lines, broken poles and damage reaching beyond local distribution into transmission lines and substations. It expects restoration to be substantially complete by late on Tuesday 18 August and finished by Friday 21 August, and has warned that further storms could reset those timelines.

FOX Chicago reported that Indiana Governor Mike Braun declared a statewide disaster emergency on Thursday, and that within hours 30 Indiana National Guard members were deployed to Munster and 30 more to Hobart to clear fallen trees and reopen access. “The goal today is to clear the right of way, to allow both utility reconnection as well as road access,” said Captain Jordan Baker of the Guard’s 113th Engineer Battalion. Two school districts, Munster and Crown Point, pushed back the start of the academic year.

When the power goes, the trains slow down too

The outage did not stop at the meter. The South Shore Line, the commuter railway linking South Bend to downtown Chicago, had run a significantly reduced timetable since the 11 August storms because of power outages across its service area. Regular weekend service on the Lakeshore Corridor resumed on Saturday and weekday service returns on Monday, but the operator cautioned that delays remain possible while railroad crossing and signal power outages persist. The trains were serviceable; the signalling they depend on was not.

Colombia: carriers rebuild after a 7.4-magnitude earthquake

Following the 10 August earthquake, DatacenterDynamics reported, citing Infobae, that repairs to telecommunications infrastructure in the affected areas are around 80 per cent complete. Claro says 80 per cent of its base stations and all of its fibre-optic nodes there are operating normally, having restored close to half of the affected stations in the first three days.

The hardest-hit departments were Chocó, Caldas, Quindío, Risaralda and Valle del Cauca. Much of the remaining work is not a telecommunications problem at all: carriers cite prolonged power outages, difficulty reaching damaged sites and limited generator fuel as the factors still restricting network nodes. Claro has installed 26 generators in cities including Quibdó, Pereira and Cali to compensate for absent mains power.

The common thread: electricity is the dependency underneath everything

Read together, the two describe the same hierarchy from opposite ends. In Indiana, a power outage degraded a railway’s signalling. In Colombia, a power outage is the main obstacle to restoring mobile networks now that the quake damage is largely repaired. Neither is a software failure. Both are reminders that always-on services rest on physical infrastructure — and that the authoritative information sits scattered across a utility’s outage page, a transit notice and a carrier’s statement, each silent about the rest.

That is the gap Status Is Down is built to close. Our real-time monitoring tracks the services and websites people depend on, so a disruption is visible as it happens. You can browse what we cover in the service directory and website directory, and follow our coverage in the outage articles archive, including this week’s Mastercard payment disruption and our look at the biggest internet outages on record. If you would rather hear about an outage from a notification than from a customer, compare our monitoring plans and create an account.

Sources

Stock photograph illustrating storm damage to overhead power lines and the road obstructions that slow restoration work. It is not a depiction of any specific location or incident described above. Image credit: ID 124577730 © Solaris Images Inc | Dreamstime.com

Recent Outage News and Features

Loading...

🌐 This article is available in other languages:

Français·Español·Português·中文·العربية·हिन्दी·日本語·Русский·Deutsch·Bahasa Indonesia·Türkçe·한국어·Kiswahili·Italiano·Nederlands·Polski·Tiếng Việt·Filipino·বাংলা